Bathroom remodel permits in Lehi, UT

Lehi issues every building permit in the city through one online portal. Here is what triggers a permit and how the process runs.

Published October 19, 2026. Reviewed against public sources listed below.

Who issues bathroom permits in Lehi?

Lehi City Building and Inspections handles and issues all building permits for Lehi. Every application goes through its Building Permit Submittal Portal, and all plans, including permit applications and structural reports, are submitted and reviewed electronically. The contractor prints the stamped, approved plans and keeps them on the job site for every inspection. Fees are set in Lehi City Code 10-2-2.

What triggers a permit?

Utah's adopted building code, as American Fork's building department quotes it, requires a permit before anyone constructs, alters or repairs a building, or installs, alters or replaces a regulated electrical, gas, mechanical or plumbing system. In a bathroom that usually means a moved toilet or shower, a new drain or supply line, new circuits, or a new exhaust fan path. Utah's statewide amendments for July 1, 2026 change the permit exemptions for retaining walls, low decks and storage containers, not for bathroom work.

Whether a cosmetic job, such as new tile on an existing floor or a vanity swap with no plumbing change, is exempt was not confirmed from a Lehi City source. Ask Lehi Building and Inspections, or have the contractor confirm it for your scope.

Inspections

Inspections need 24 hours' notice and are scheduled by phone with the Building Inspection Office, not by voicemail, email or online. The city charges a re-inspection fee when a project is clearly not ready.

The general Lehi sequence

Contractor submits plans in the Lehi permit portal, then City reviews and stamps the plans electronically, then Permit issued and fees paid, then Inspections with 24 hours notice, then Final inspection Contractorsubmits plans inthe Lehi permitportal City reviews andstamps the planselectronically Permit issuedand fees paid Inspections with24 hours notice Final inspection Contractor submits plans in the Lehi permit portal, then City reviews and stamps the plans electronically, then Permit issued and fees paid, then Inspections with 24 hours notice, then Final inspection Contractor submits plansin the Lehi permitportal City reviews and stampsthe plans electronically Permit issued and feespaid Inspections with 24hours notice Final inspection
The general sequence for a Lehi bathroom remodel that needs a permit. Your contractor confirms the steps for your scope.

Permit questions

Does Utah County issue Lehi bathroom permits?

No. Lehi City Building and Inspections issues all building permits in Lehi.

How much notice does a Lehi inspection need?

24 hours. Inspections are scheduled by calling the Building Inspection Office, not by voicemail, email or online.

Ask a licensed remodeling contractor to follow up

Send a request with your address and what you want changed in the bathroom. We pass it to one independent licensed remodeling contractor who serves Lehi, UT, if one is available.

Free referral service. An independent licensed remodeling contractor does the work. How this works.

Send a requestRequest a callback